A generator that has never carried the building's load is a plan, not a backup. Readiness is three unglamorous things, checked before storm season rather than during it: fuel (fresh, treated where the manufacturer calls for it, and enough of it for the outage you actually plan for), the transfer switch (exercised under load, so the first real transfer is not the test), and the log (every run recorded — date, duration, load, and anything that sounded wrong). The loads that matter are life-safety loads: egress lighting, fire alarm, elevators where the building relies on them, and heating circulation in cold country. Know which of them your generator actually carries, and post that list where the on-call person will find it at 3 a.m. When did your generator last run under real load — and who besides you knows? — Admin
NSPIRE Forum » Hazards & Health » Storm & Disaster Damage » Generator readiness before storm season: fuel, transfer switch, and the test log
Nov 19, 2026, 5:15 PM
All Building Services LLC — https://renovatemyapartment.com
NSPIRE Photo-Check — https://nspirephotocheck.com
Sign In or register free to reply to this thread. Reading is always open.